If a project spec citing Section 01 78 23 just landed on your desk — or a consultant kicked back your closeout submittal for not following it — this page explains exactly what the section requires, so you're not guessing.
Section 01 78 23, "Operation and Maintenance Data and Manuals," is part of Alberta Infrastructure's Basic Master Specification. It governs O&M manual requirements on provincially-owned buildings — schools, health facilities, and other government-funded construction across Alberta. It is not the same as a private-sector CCDC-style closeout section, and treating it like one is the single most common reason a submittal gets bounced back.
For every major piece of equipment, system, material, or finish on the project, its O&M data must be organized into three divisions, repeated per item — not one shared section for the whole manual:
Operation Division — Design Criteria, Controls Descriptions, Controls Schematics, Operating Instructions
Maintenance Division — Tasks and Schedules, Spare Parts, Suppliers and Contractors, Tags and Directories
Contract Document Division — Drawings List, Shop Drawings and Product Data, Certifications, Warranties and Bonds, Maintenance Brochures, Reports
There is no manual-wide "Standards" division at this level — that only appears inside the trade-specific mechanical and electrical sections (see below).
21.5×28cm, 75g/m² white bond paper
Fabric-coated hard binders, 3-post, maximum 100mm thick
Colour-coded by discipline (Mechanical: blue #OBV460, Electrical: red #OBV037)
Three-tier tab system: white "Main Division" tabs, discipline-coloured "Section" tabs, discipline-coloured "Subsection" tabs
Four copies due prior to Interim Acceptance of the Work
Contractor Responsible — the Contractor collects all data and prepares the manuals; the Consultant only reviews.
Consultant and Contractor Shared Responsibility — used only when the full Facility Start-Up program (Section 01 91 01) applies. The Consultant prepares the Mechanical (Division 23) and Electrical (Division 26) manuals specifically; the Contractor handles everything else.
Don't assume — this is one of the first things to confirm with the Consultant of Record, because it determines who you're actually coordinating mechanical and electrical content with.
Section 01 78 23 is the base requirement. Mechanical and electrical manuals are governed by their own trade-specific sections, and each adds a real fourth division:
Section 20 01 06 — Mechanical O&M Manual organizes into four divisions (Operations, Maintenance, Contract Documentation, and a Standards division reserved for Province-supplied content), with system-category tabs: AIR, CLG (Cooling), FPN (Fire Protection), HTG (Heating), MIS (Miscellaneous), and PLG (Plumbing).
Section 26 01 11 — Electrical O&M Manual organizes into six colour-coded system categories (PDS, LTG, COM, FSS, SEC, SPS), each broken into four sections (Operations, Maintenance, Contract Documentation, Standards).
See our full consultant discovery questionnaire on the For Engineers page.
Alberta Infrastructure's own contracts don't use "Substantial Completion" — that's private-sector, CCDC-style language. The real sequence is:
Interim Acceptance → Practical Completion (Facility Start-Up projects only) → Final Acceptance
If the project isn't running the full Facility Start-Up program, Practical Completion doesn't apply — only Interim and Final Acceptance do. Confirm which vocabulary the contract actually uses before you build your submission timeline around it.
Not every Alberta project uses the full 01 78 23 framework. Small or simple contracts can instead cite Section 01 77 00 (broadscope closeout) — a completely different, simplified deliverable: a single vinyl expanding binder, no tab-colour system, no division structure. If your spec cites 01 77 00, everything above about divisions and tab colours doesn't apply. Confirm the actual section cited before assuming which track governs.
No. It's specific to Alberta Infrastructure–owned buildings (schools, health facilities, government projects) and uses its own division structure and acceptance-milestone terminology, which differ from CCDC/private-sector conventions.
It depends on the delivery model the project spec calls for. Contractor-only is more common; shared responsibility (Consultant prepares Mechanical and Electrical) only applies when the full Facility Start-Up program is running and the Consultant is compensated for it.
Building a full tabbed, divisional manual against a project that actually cites the simplified 01 77 00 track — or vice versa — means rebuilding the manual from scratch. Confirm the exact section cited before compilation starts.
Yes, under Section 20 01 06 — the mechanical manual must be reviewed by the Consultant, the Independent Commissioning Authority, and the Province before the Operator Training Seminar (Section 01 79 00).
ProSpec Manuals builds Alberta Infrastructure–compliant O&M manuals for Calgary-area contractors — right division structure, right tab codes, right acceptance-milestone language, first time.